thevossoughi@gmail.com JOB OBJECTIVE Seeking an opportunity to work as a process engineer SUMMARY OF
QUALIFICATIONS § 3+
years’ experience as a Group Manager, in Operations and Logistics
departments, with emphasis on work efficiency, operator productivity,
facility improvement and organizational consistency. § A
skilled supervisor, adept at quickly resolving concerns and issues with his
own department and other departments, while focusing on optimizing the
operational process to be as efficient as possible. § Known
for resourcefulness in equipment maintenance issues, problem-solving skills
and creative improvements. WORK EXPERIENCE Anheuser-Busch
InBev, Merrimack Brewery, Warehouse/Logistics, Warehouse Group Manager
April 2013 to Present § Subject
Matter Expert on Overage Beer Process, 5S, SAP, WMS and Maintenance
Troubleshooting. § Trained
and acted as Logistics BPM for several weeks, creating production schedules
for the Operations Department, coordinating beer volume with the Brewing
Department and scheduling shipments with Corporate Transportation. § Rotated
throughout all three shifts and had experience working with different crews
of union employees § Managed
between 6-10 direct reports daily and addressed all of their daily concerns
swiftly § Lead
the transition of the Bulk Glass Depalletizer equipment center from
Operations to Warehouse, established a RACI along with multiple 5S
cabinets/racks and addressed many maintenance issues with Operations § Regulated
the Warehouse Management System (WMS) queue and used line production orders
(RTS) as well as future shipments to optimize productivity § Coordinated
high priority shipments with Corporate Logistics and NFI contractors to
expedite OOS shipments and optimize trailer pool § Performed
many instances of operator recognition, coaching and counseling § Designed
5S improvements for the Warehouse and managed 5S Improvement Work Orders in
SAP § Lead
the Logistics department’s warehouse efficiency to meet all of our Key
Performance Indicators for 2013
Anheuser-Busch InBev, Merrimack Brewery, Operations, Process Support Group
Manager July
2012 to March 2013 § Lubrication
Champion for lubrication issues/escalation/scheduling § Executed
daily planning with direct reports, the OPS Painters and Oilers § Monitored
and reported daily Maintenance performance metrics to Line BPMs § Performed
Maintenance Technician Op-tech Tier 2 Coaching/Training § Coordinated
Operations Line Equipment Breakdown Support with technicians § Coordinated
Shop/Support equipment maintenance and parts planning § Performed
audits on all Maintenance Shop PMs, downscaled excess WO hours and added new
PMs for neglected equipment § Performed
daily on-shift equipment troubleshooting § Worked
with Process Engineers, Corporate Engineers and Engineers from external
equipment vendors on new projects
GE
Aviation, Lynn MA, HPT Military – Mission Analysis, Engineering Intern
May to August 2011 §
Performed different mission analyses to display to various
Aviation departments using mission data as well as specific requested
parameters and formats §
Analyzed data from both military and civil aircraft engine
lines for US and international organizations §
Presented and revised reports, charts and data with lead
engineers and department staff engineers for approval §
Lead other interns and engineers regarding current tasks
and mission analysis processes ACADEMIC PROJECTS Automobile
Engineering/Super-Mileage Vehicle, Transmission/Clutch team
Sept. 2011 to June 2012 § Worked
with a group of three to design, fabricate and assemble a clutch system for
the Super-Mileage Vehicle § Planned
and organized a timeline of team objectives and met all priority tasks on or
before the deadline § Machined
several clutch components from engineering drawings using a Bridgeport
Milling Machine § Collaborated
with other groups, such as the Body and Engine teams, to combine clutch
assembly into their designs § Placed 5th in the
Society of Automotive Engineers Super-mileage competition in Marshall,
Michigan, obtaining 843 mpg.
Design and Analysis of Two Automobile Rims
Fall 2010 § Worked
with a group of four to design two car rims, researched its interior and
exterior properties, performed a finite element analysis, and redesigned the
rims to improve durability as well as reduce material volume for cost
reduction § Constructed
the rim models based on two rims, one from a Volvo V70 and one from an Audi
A6, in the group’s possession § Researched
material properties, vehicle specifications, exterior forces and
manufacturing processes to implement into our model analyses in ANSYS and
Solidworks § Reduced
76.67 in³, about 20%, of material in our cost-based redesign of the Audi rim,
which would have saved Audi $3.4 million in 2002 Audi A6 US sales § Reduced 7
in³ of material in our durability-based redesign of the Audi rim while
increasing the safety factor by 2.33 and reducing maximum equivalent stress
by over 100 psi § Presented
our project in front of a class and our professor as well as composed our
project in a 15-page report EDUCATION Page 1 of 2 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|